Water Infrastructure AI

MATCH

Cross-revision tracking for REVIEW findings

MATCH aligns sheets across revisions, detects drawing changes, and decides whether prior findings were resolved, still open, or need manual review.

Aligned sheets

82

Open

64

Resolved

7

Needs review

2

Revision pair

Demo data compares December 17, 2025 to March 11, 2026.

Alignment

Sheet alignment results

93 added · 0 removed

Aligned

82

Renumbered

0

Added

93

Removed

0

Rev ARev BStatusMatch

00G-01

CLIFF BROUHARD, P.E., PTOE (CITY ENGINEER) DATE: BRET J. THOMPSON, P.E. 145281

00G-01

CLIFF BROUHARD, P.E., PTOE (CITY ENGINEER) 03/11/2026

aligned98%

00G-02

SHEET INDEX Sheet List Table Sheet Number Sheet Title (00) GENERAL

00G-02

SHEET INDEX Sheet Index Sheet Number Sheet Title (00) GENERAL

aligned98%

00G-03

LIST OF ABBREVIATIONS

00G-03

LIST OF ABBREVIATIONS

aligned100%

00G-04

LEGENDS, SYMBOLS AND SITE INFORMATION

00G-04

LEGENDS, SYMBOLS AND SITE INFORMATION

aligned100%

00G-05

TAGGING CONVENTIONS

00G-05

TAGGING CONVENTIONS

aligned100%

00G-06

GENERAL PROJECT NOTES

00G-06

GENERAL PROJECT NOTES

aligned100%

00G-11

EXISTING PROCESS FLOW DIAGRAM

00G-11

EXISTING PROCESS FLOW DIAGRAM

aligned100%

00G-12

PROPOSED PROCESS FLOW DIAGRAM

00G-12

PROPOSED PROCESS FLOW DIAGRAM

aligned100%

00D-01

EXISTING HYDRAULIC PROFILE

00D-01

EXISTING HYDRAULIC PROFILE

aligned100%

00D-02

MODIFIED LIQUID PROCESS HYDRAULIC PROFILE

00D-02

MODIFIED LIQUID PROCESS HYDRAULIC PROFILE

aligned99%

00D-03

MODIFIED LIQUID SOLIDS HYDRAULIC PROFILE

00D-03

MODIFIED LIQUID SOLIDS HYDRAULIC PROFILE

aligned99%

01C-01

EXISTING SITE PLAN B.THOMPSON B. THOMPSON DATE:

01C-01

EXISTING SITE PLAN B.THOMPSON B. THOMPSON 03/11/2026

aligned99%

Timeline

Finding lifecycle

Rev A findings carried to MATCH

73

Resolved in Rev B

7

Still open in Rev B

64

Needs manual review

2

Resolution queue

Review findings in Rev B

97 new issues detected